RF Wireless World

Browse articles, tutorials, tools, and vendors.

GDDR vs HBM: Key Differences in Graphics Memory

By RF Wireless Expert Team

This article explores the differences between GDDR (Graphics Double Data Rate) and HBM (High Bandwidth Memory), two prominent memory types used in high-performance graphics cards. We’ll use GDDR6 and HBM2 as examples to illustrate the distinctions.

Introduction

Both GDDR and HBM play a crucial role in modern graphics processing. GDDR stands for Graphics Double Data Rate Memory, while HBM stands for High Bandwidth Memory. Let’s dive into their characteristics.

GDDR Memory

GDDR memory GDDR memory

As depicted above, GDDR memory typically has a square or rectangular shape. Key manufacturers include Samsung, Hynix, ELPIDA, and Micron.

GDDR5 memory is commonly available in sizes like 512 MB, 1 GB, 2 GB, 4 GB, and 8 GB. The evolution of GDDR memory includes GDDR1 through GDDR5, GDDR5X, and GDDR6.

The following table summarizes the features of various GDDR memory types:

difference between GDDR memory types difference between GDDR memory types

HBM Memory

HBM memory HBM memory

HBM uses a non-planar memory structure with a 3D design, often in a cube or cuboid shape. Multiple memory chips are stacked vertically to form this cube structure. This design results in a smaller footprint, allowing it to be mounted closer to the GPU for faster processing. Hynix and Samsung are key manufacturers of HBM.

The evolution of HBM includes HBM1, HBM2, and HBM3.

The following table outlines the features of different HBM memory types:

difference between HBM memory types difference between HBM memory types

GDDR vs. HBM: A Tabular Comparison

Here’s a table highlighting the key differences between GDDR and HBM memory types, using GDDR6 and HBM2 as examples:

SpecificationsGDDR (Example : GDDR6)HBM (Example : HBM2)
DRAM density16GB (per chip)64 GB (per stack)
#channels / DRAM package2 channels8 channels
# bits per channel16 bits128 bits
Speed16 Gb/s2.4 Gb/s
Overall bandwidth64 GB/s307 GB/s
Power efficiencyGoodBetter than GDDR6 version
CostLower than HBM2Higher than GDDR6
PackagingTraditional DRAM on PCBUses 2.5D interposer for connectivity between host and HBM2 DRAMs

Explore Core Memory Concepts & Fundamentals

Continue Learning RAM (Random Access Memory) Architectures & Types

Deep dives into the volatile memory used for active processing, including DDR, Graphics RAM, and emerging MRAM technologies.

Explore Comparison between RAM Types

Keep Reading